Extracts calculation detail for a PIA Definition.
GETPIADETAIL("DefName", Type, MeasDate (optional))
"DefName": the name of the item for which you need additional detail. This name must be enclosed in quotes.
Type: refer to the table below to determine the type code to use:
MeasDate: this is the date as of which the amount determination is to be made for purposes of getting the requested detail.
If no date is passed here, DB Precision will measure as of the end date passed and if any calculation has already been done on or after the end date, the system will pull calculation details from those results.
This date generally only needs to be specified if you need to specify an exact calculation and account determination date (that is then equal to this date) for determining this detail.